Puhinui Interchange train station
05/05/2021
Challenge: McConnell Dowell required heavy-duty structur
Read MoreRead More
Challenge: McConnell Dowell required heavy-duty structur
Read MoreRead More
Challenge: Worthingtons Painters needed to access corrod
Read MoreRead More
Read More
TPL Access were contracted provide an access solution for building remedial and asbestos removal works. We designed and built a public access gantry with a completely free standing structure due to the heritage nature of the building. Designed and built to work around mature trees while still providing access to residents & pedestrians.
Read MoreRead More
TPL Access were contracted to provide an access solution for the Auckland Art Gallery for annual maintenance of their Kauri soffits. A 180 cubic metre birdcage scaffold with multiple specialised access platforms was designed, engineered and constructed for this.
Read MoreRead More
TPL Access were contracted to provide a specialized access solution for TVNZ’s historic “Goodnight Kiwi” aerial. This was a 30m high engineered scaffold with extensive backpropping.
Read MoreRead More
TPL Access were contracted to provide specialised access for Golden Bay Cement in Portland’s 5 year long concrete silo remediation project. We designed and constructed fully engineered scaffolding for silos 2-6, each silo was roughly 30m in heights and also included full shrinkwrap encapsulation. We utlised our GEDA hoists for worker and materials access to maximise productivity and efficiency for our client.
Read MoreRead More
TPL Access were contracted to provide scaffolding for the construction of a large retirement village in Hobsonville. We supplied and installed 3000m2 of scaffold for this project.
Read MoreRead More
TPL Access were contracted to supply and install a fully engineered scaffolding solution for façade re-painting and repair works on the iconic Farmers Building in Auckland’s CBD.
Read MoreRead More
TPL Access were contracted to provide access to the underside of the bridge. The scaffold enabled repair work on the damaged concrete using hydro-demolition. The contract specified the bridge should remain open for vehicle and pedestrian access during this 6 month maintenance project.
Read More